Status of estimates for emergency work
In a normal prosedur, estimate is made based on drawings to predict the cost of a project for tender analysis purposes. However, in emergency works, such as land slides that disrupt public facilities, the normal procedure is inappropriate because of its time consuming process. Thus, the Malaysian Tr...
Saved in:
Main Author: | Maidin, Noraini |
---|---|
Format: | Thesis |
Published: |
2010
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Client satisfaction on contractors' work performance
by: Adanan, Hadiatul Aida
Published: (2006) -
Disaster And Emergency Planning And
Preparedness In The Jordanian Hotel
Industry
by: Suleiman Albattat, Ahmad Rasmi
Published: (2016) -
Estimate in formation of construction contract
by: Ahmad Termizi, Ezatul Sharida
Published: (2013) -
Computerised building cost estimating system
by: Marjuki, Mofti
Published: (2006) -
The Influence Of Uncertainty Variables On
Project Cost Estimation
by: Rauzana, Anita
Published: (2015)