A lesson from the Sedyatmo package 4 additional elevated lane toll road project

The construction of additional elevated lanes in the Prof. Dr. Ir. Sedyatmo Toll Road (Sedyatmo) on both its north and south sides was a fast track project to provide better accessibility to Jakarta’s International Airport Soekarno-Hatta and vice versa. Sedyatmo designed using pile slab bridge struc...

全面介紹

Saved in:
書目詳細資料
主要作者: Tri Prakoso, Endar
格式: Thesis
出版: 2011
主題:
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!
id my-utm-ep.36710
record_format uketd_dc
spelling my-utm-ep.367102020-02-18T03:35:51Z A lesson from the Sedyatmo package 4 additional elevated lane toll road project 2011 Tri Prakoso, Endar HE Transportation and Communications The construction of additional elevated lanes in the Prof. Dr. Ir. Sedyatmo Toll Road (Sedyatmo) on both its north and south sides was a fast track project to provide better accessibility to Jakarta’s International Airport Soekarno-Hatta and vice versa. Sedyatmo designed using pile slab bridge structure. Pile slab bridge is a structure which consists of a reinforced concrete slab in one direction (one way slab) and supported by the pile group system. This structure has been tested for application and suitable for soft soil condition. In the phase of construction Sedyatmo, many factors challenges the Contractor to complete this project on time. Demand of toll road project in Indonesia nowdays is still promising. Challenges in optimizing design, cost and construction method of Sedyatmo should be a lesson learned when dealing with the next future project similar to Sedyatmo. The objectives of this study are to compare the design, cost and construction method of Sedyatmo and to suggest factors should be followed when dealing with the pile slab structure project similar to Sedyatmo. Three designs pile slab of Sedyatmo is Original Design, Propose Design and Review Design. Comparasion analysis are employed to compare these design, cost and construction method respectively. Qualitative analysis on key personnels Sedyatmo is conducted to search suggest factors. The analysis found that among those designs, the most desirable is Review Design. The analysis also suggest that factor construction resources are the most suggest factor which should be followed. It should be noted that the best alternatives found in this study are limited to Sedyatmo. If this lesson used, are applied for other projects, they may not yield the same results. This is mainly due to the uniqueness and circumstances of each project. 2011 Thesis http://eprints.utm.my/id/eprint/36710/ masters Universiti Teknologi Malaysia, Faculty of Built Environment Faculty of Built Environment
institution Universiti Teknologi Malaysia
collection UTM Institutional Repository
topic HE Transportation and Communications
spellingShingle HE Transportation and Communications
Tri Prakoso, Endar
A lesson from the Sedyatmo package 4 additional elevated lane toll road project
description The construction of additional elevated lanes in the Prof. Dr. Ir. Sedyatmo Toll Road (Sedyatmo) on both its north and south sides was a fast track project to provide better accessibility to Jakarta’s International Airport Soekarno-Hatta and vice versa. Sedyatmo designed using pile slab bridge structure. Pile slab bridge is a structure which consists of a reinforced concrete slab in one direction (one way slab) and supported by the pile group system. This structure has been tested for application and suitable for soft soil condition. In the phase of construction Sedyatmo, many factors challenges the Contractor to complete this project on time. Demand of toll road project in Indonesia nowdays is still promising. Challenges in optimizing design, cost and construction method of Sedyatmo should be a lesson learned when dealing with the next future project similar to Sedyatmo. The objectives of this study are to compare the design, cost and construction method of Sedyatmo and to suggest factors should be followed when dealing with the pile slab structure project similar to Sedyatmo. Three designs pile slab of Sedyatmo is Original Design, Propose Design and Review Design. Comparasion analysis are employed to compare these design, cost and construction method respectively. Qualitative analysis on key personnels Sedyatmo is conducted to search suggest factors. The analysis found that among those designs, the most desirable is Review Design. The analysis also suggest that factor construction resources are the most suggest factor which should be followed. It should be noted that the best alternatives found in this study are limited to Sedyatmo. If this lesson used, are applied for other projects, they may not yield the same results. This is mainly due to the uniqueness and circumstances of each project.
format Thesis
qualification_level Master's degree
author Tri Prakoso, Endar
author_facet Tri Prakoso, Endar
author_sort Tri Prakoso, Endar
title A lesson from the Sedyatmo package 4 additional elevated lane toll road project
title_short A lesson from the Sedyatmo package 4 additional elevated lane toll road project
title_full A lesson from the Sedyatmo package 4 additional elevated lane toll road project
title_fullStr A lesson from the Sedyatmo package 4 additional elevated lane toll road project
title_full_unstemmed A lesson from the Sedyatmo package 4 additional elevated lane toll road project
title_sort lesson from the sedyatmo package 4 additional elevated lane toll road project
granting_institution Universiti Teknologi Malaysia, Faculty of Built Environment
granting_department Faculty of Built Environment
publishDate 2011
_version_ 1747816447749390336