Notice condition precedent to claim liquidated ascertained damages (LAD)
Most forms of building contract include a clause entitling the employer to a specified amount of damages, referred to as liquidated and ascertained damages (LAD) if the contractor is late in constructing a project. This clause sets out the procedure and condition that need to be followed by the empl...
Saved in:
主要作者: | Mansor, Nur Syaimasyaza |
---|---|
格式: | Thesis |
语言: | English |
出版: |
2011
|
主题: | |
在线阅读: | http://eprints.utm.my/id/eprint/36798/1/NurSyaimasyazaMansorMFAB2011.pdf |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|
相似书籍
-
Liquidated and ascertained damages (LAD) and requirements of mitigation
由: Yong, Mei Lee
出版: (2006) -
Notice of loss and/or expense claim in PAM 2006
由: Titus, Olalekan Olaolu
出版: (2009) -
Application of estoppel and waiver in the non-fulfillment of condition precedent
由: Hidzir, Nur 'Izzati
出版: (2014) -
Global claims for damages in construction contracts
由: Han, Siew Hee
出版: (2011) -
Service of notice for determination in construction contracts
由: Wan Ibrahim, Wan Mohd. Izzuddin
出版: (2011)