The study on impact of project delay to construction cost

Saved in:
Bibliographic Details
Main Author: Maulana, Dimas
Format: Thesis
Published: 2011
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-utm-ep.36848
record_format uketd_dc
spelling my-utm-ep.368482014-05-04T09:29:24Z The study on impact of project delay to construction cost 2011 Maulana, Dimas TA Engineering (General). Civil engineering (General) 2011 Thesis http://eprints.utm.my/id/eprint/36848/ masters Universiti Teknologi Malaysia, Faculty of Built Environment Faculty of Built Environment
institution Universiti Teknologi Malaysia
collection UTM Institutional Repository
topic TA Engineering (General)
Civil engineering (General)
spellingShingle TA Engineering (General)
Civil engineering (General)
Maulana, Dimas
The study on impact of project delay to construction cost
description
format Thesis
qualification_level Master's degree
author Maulana, Dimas
author_facet Maulana, Dimas
author_sort Maulana, Dimas
title The study on impact of project delay to construction cost
title_short The study on impact of project delay to construction cost
title_full The study on impact of project delay to construction cost
title_fullStr The study on impact of project delay to construction cost
title_full_unstemmed The study on impact of project delay to construction cost
title_sort study on impact of project delay to construction cost
granting_institution Universiti Teknologi Malaysia, Faculty of Built Environment
granting_department Faculty of Built Environment
publishDate 2011
_version_ 1747816467793969152