Risiko dan pengurusannya dalam pembinaan : perspektif kontraktor

Risk is a condition that cannot be identified accurately. Its existence is always referred to a situation that can cause negative effect such as destruction or loss. In construction works, the existence of risk is always linked to project delay or cost increase. However, this negative effect can be...

全面介紹

Saved in:
書目詳細資料
主要作者: Abd. Kadir, Aslila
格式: Thesis
語言:English
出版: 2006
主題:
在線閱讀:http://eprints.utm.my/id/eprint/3691/7/AslilaAbdKadirMFKA2006.pdf
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!
id my-utm-ep.3691
record_format uketd_dc
spelling my-utm-ep.36912020-03-09T07:15:52Z Risiko dan pengurusannya dalam pembinaan : perspektif kontraktor 2006-04 Abd. Kadir, Aslila TA Engineering (General). Civil engineering (General) Risk is a condition that cannot be identified accurately. Its existence is always referred to a situation that can cause negative effect such as destruction or loss. In construction works, the existence of risk is always linked to project delay or cost increase. However, this negative effect can be avoided or minimised. As a party who is responsible in running the construction works, contractors should be prepared to manage construction risk as to ensure the success of the project. The aim of the project is to examine risk that is normally faced by contractors and how they manage the identified risk. The scope of the project focuses on the existence of risk during the construction progress. Hence, only experience contractors within Johor State are chosen. This project involves literature review and questionnaire distributed to contractors. Gathered data was analysed using SPSS method. The findings show that the contractors were fully aware of the existence of risk and believe that risk was something that needs to be identified and managed. Risk related to finance was type of risk that is commonly faced by the contractors and it contributed the highest level of seriousness in construction. As a mean to minimise the risk effect, the contractors felt comfortable to do and early work program. However, other risk management method were also implemented, such as to do analysis on previous project and appointed consultant 2006-04 Thesis http://eprints.utm.my/id/eprint/3691/ http://eprints.utm.my/id/eprint/3691/7/AslilaAbdKadirMFKA2006.pdf application/pdf en public masters Universiti Teknologi Malaysia, Faculty of Civil Engineering Faculty of Civil Engineering
institution Universiti Teknologi Malaysia
collection UTM Institutional Repository
language English
topic TA Engineering (General)
Civil engineering (General)
spellingShingle TA Engineering (General)
Civil engineering (General)
Abd. Kadir, Aslila
Risiko dan pengurusannya dalam pembinaan : perspektif kontraktor
description Risk is a condition that cannot be identified accurately. Its existence is always referred to a situation that can cause negative effect such as destruction or loss. In construction works, the existence of risk is always linked to project delay or cost increase. However, this negative effect can be avoided or minimised. As a party who is responsible in running the construction works, contractors should be prepared to manage construction risk as to ensure the success of the project. The aim of the project is to examine risk that is normally faced by contractors and how they manage the identified risk. The scope of the project focuses on the existence of risk during the construction progress. Hence, only experience contractors within Johor State are chosen. This project involves literature review and questionnaire distributed to contractors. Gathered data was analysed using SPSS method. The findings show that the contractors were fully aware of the existence of risk and believe that risk was something that needs to be identified and managed. Risk related to finance was type of risk that is commonly faced by the contractors and it contributed the highest level of seriousness in construction. As a mean to minimise the risk effect, the contractors felt comfortable to do and early work program. However, other risk management method were also implemented, such as to do analysis on previous project and appointed consultant
format Thesis
qualification_level Master's degree
author Abd. Kadir, Aslila
author_facet Abd. Kadir, Aslila
author_sort Abd. Kadir, Aslila
title Risiko dan pengurusannya dalam pembinaan : perspektif kontraktor
title_short Risiko dan pengurusannya dalam pembinaan : perspektif kontraktor
title_full Risiko dan pengurusannya dalam pembinaan : perspektif kontraktor
title_fullStr Risiko dan pengurusannya dalam pembinaan : perspektif kontraktor
title_full_unstemmed Risiko dan pengurusannya dalam pembinaan : perspektif kontraktor
title_sort risiko dan pengurusannya dalam pembinaan : perspektif kontraktor
granting_institution Universiti Teknologi Malaysia, Faculty of Civil Engineering
granting_department Faculty of Civil Engineering
publishDate 2006
url http://eprints.utm.my/id/eprint/3691/7/AslilaAbdKadirMFKA2006.pdf
_version_ 1747814462909317120