Executive information system for monitoring building construction work progress

Progress monitoring and control is one of the most important tasks when managing a project. Basically, construction works produce a lot of information and it is the responsibility of the top management to track the work progress at project site. A recent issue highlights inefficiency in obtaining in...

Full description

Saved in:
Bibliographic Details
Main Author: Zakaria, Wan Zahran
Format: Thesis
Language:English
Published: 2013
Subjects:
Online Access:http://eprints.utm.my/id/eprint/37937/1/WanZahranZakariaPFKA2013.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-utm-ep.37937
record_format uketd_dc
spelling my-utm-ep.379372018-04-12T05:38:44Z Executive information system for monitoring building construction work progress 2013-03 Zakaria, Wan Zahran TA Engineering (General). Civil engineering (General) Progress monitoring and control is one of the most important tasks when managing a project. Basically, construction works produce a lot of information and it is the responsibility of the top management to track the work progress at project site. A recent issue highlights inefficiency in obtaining information from site on time. Hence, the focus of this research is to establish a computerized information system which can be utilized by the top management in order to evaluate the construction progress. The aim of this research is to propose a model and develop a computerized project progress monitoring system, known as Executive Information Site Monitoring System (EISMS). Before developing EISMS, current problems faced by the top management in monitoring work progress and various models for construction monitoring in Malaysia Construction Industry were investigated through a questionnaire survey. It was found that manual data collection, time consuming report making, and no on-time corrective actions are current problems incurred by the top management in Malaysia. Indeed, monitoring of work progress depends on a combination of three methods; taking pictures from construction processes, having a database, and using planning software such as Microsoft Project (MS Project). EISMS was developed based on the Waterfall Model and the process began by identifying system requirements, system analysis, system designs, coding, integration and finally system testing and implementation. The system requires three primary data which include; planned work schedule, 3DCAD drawing, and actual work completion at site. From these three parameters, the system is able to compute scheduled and actual work progress and hence schedule variance at any selected evaluation date. In conclusion, EISMS was successfully implemented during construction phase allowing the top management of construction organizations to monitor the construction site progress more efficiently, which helps them in decision making and taking timely appropriate action. 2013-03 Thesis http://eprints.utm.my/id/eprint/37937/ http://eprints.utm.my/id/eprint/37937/1/WanZahranZakariaPFKA2013.pdf application/pdf en public phd doctoral Universiti Teknologi Malaysia, Faculty of Civil Engineering Faculty of Civil Engineering
institution Universiti Teknologi Malaysia
collection UTM Institutional Repository
language English
topic TA Engineering (General)
Civil engineering (General)
spellingShingle TA Engineering (General)
Civil engineering (General)
Zakaria, Wan Zahran
Executive information system for monitoring building construction work progress
description Progress monitoring and control is one of the most important tasks when managing a project. Basically, construction works produce a lot of information and it is the responsibility of the top management to track the work progress at project site. A recent issue highlights inefficiency in obtaining information from site on time. Hence, the focus of this research is to establish a computerized information system which can be utilized by the top management in order to evaluate the construction progress. The aim of this research is to propose a model and develop a computerized project progress monitoring system, known as Executive Information Site Monitoring System (EISMS). Before developing EISMS, current problems faced by the top management in monitoring work progress and various models for construction monitoring in Malaysia Construction Industry were investigated through a questionnaire survey. It was found that manual data collection, time consuming report making, and no on-time corrective actions are current problems incurred by the top management in Malaysia. Indeed, monitoring of work progress depends on a combination of three methods; taking pictures from construction processes, having a database, and using planning software such as Microsoft Project (MS Project). EISMS was developed based on the Waterfall Model and the process began by identifying system requirements, system analysis, system designs, coding, integration and finally system testing and implementation. The system requires three primary data which include; planned work schedule, 3DCAD drawing, and actual work completion at site. From these three parameters, the system is able to compute scheduled and actual work progress and hence schedule variance at any selected evaluation date. In conclusion, EISMS was successfully implemented during construction phase allowing the top management of construction organizations to monitor the construction site progress more efficiently, which helps them in decision making and taking timely appropriate action.
format Thesis
qualification_name Doctor of Philosophy (PhD.)
qualification_level Doctorate
author Zakaria, Wan Zahran
author_facet Zakaria, Wan Zahran
author_sort Zakaria, Wan Zahran
title Executive information system for monitoring building construction work progress
title_short Executive information system for monitoring building construction work progress
title_full Executive information system for monitoring building construction work progress
title_fullStr Executive information system for monitoring building construction work progress
title_full_unstemmed Executive information system for monitoring building construction work progress
title_sort executive information system for monitoring building construction work progress
granting_institution Universiti Teknologi Malaysia, Faculty of Civil Engineering
granting_department Faculty of Civil Engineering
publishDate 2013
url http://eprints.utm.my/id/eprint/37937/1/WanZahranZakariaPFKA2013.pdf
_version_ 1747816512819822592