Pengurusan bahan buangan pembinaan : satu kajian kes projek pembinaan Jalan Simpang Pulai Lojing - Gua Musang-Kuala Berang
The increasing awareness of environmental impacts from construction wastes has made waste management as an important aspects of construction project management. Various approaches for managing construction waste have been developed in the existing construction practices. The objectives of this study...
Saved in:
Main Author: | Mat Zin, Mohamad Alwi |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2005
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/3803/1/MohamadAlwiMatZinMFKA2005.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Penjadualan projek untuk pembinaan jalan di kawasan tanah berpaya
by: Ismail, Ahmad Azizi
Published: (2010) -
Kompetensi pengurus projek kontraktor bagi pembinaan jalan raya di Sumatera Barat Indonesia
by: Edrizal, Edrizal
Published: (2022) -
Pengurusan sumber asli ke arah pembangunan mapan di Lojing, Gua Musang, Kelantan
by: Che Muda, Che Hamat
Published: (2013) -
Pengurusan sumber asli ke arah pembangunan mapan di Lojing, Gua Musang, Kelantan.
by: Che Muda Che Hamat
Published: (2013) -
Kelemahan pengawalan pada projek pembinaan
by: Yutiar, Yutiar
Published: (1999)