Best endeavours' for granting extension of time in construction contract
Extension of time is a remedy for contractor due to delay caused by employer or neutral event. One of the normal conditions that a contractor needs to fulfil in an application for the extension of time is that he must have used his best endeavours to reduce or prevent the delay. It is in fact a cond...
Saved in:
主要作者: | Rasid, Nur Farah Farhana |
---|---|
格式: | Thesis |
語言: | English |
出版: |
2012
|
主題: | |
在線閱讀: | http://eprints.utm.my/id/eprint/41598/5/NurFarahFarhanaRasidMFAB2012.pdf |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
相似書籍
-
'Best endeavours' for granting extension of time in construction contract
由: Rasid, Nur Farah Farhana
出版: (2012) -
Time essence and termination in construction contract
由: Liew, Li Ming
出版: (2009) -
Profiling of extension of time cases in Malaysian construction projects
由: Abdul Latif, Abdul Hafiz
出版: (2022) -
Profiling of valid available grounds to claim extension of time in construction industry
由: Lam, Tian Sui
出版: (2020) -
Extension of time in commencement of arbitration proceedings
由: Mokhtar, Noor Halwani
出版: (2012)