Evaluation on current practice in work breakdown structure approach for construction schedules
Saved in:
Main Author: | Md. Isha, Mohd. Nasir |
---|---|
Format: | Thesis |
Published: |
2004
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Evaluation on current practice in work breakdown structure approach for construction schedules
by: Md. Isha, Mohd. Nasir
Published: (2005) -
A study of current design & build procurement approach practice based on the client‟s specific expectations in the Malaysian Construction Industry
by: Gambo, Muhammad Mustapha
Published: (2011) -
The prevailing practice in deciding the practical completion of construction work
by: Mohd. Yunos, Mohammad Harith
Published: (2015) -
Integrating construction sheduling and knowledge-based systems for generating material scheduling
by: Kasim, Narimah
Published: (2000) -
Scheduling on transportation for industrialized building systems
by: Foong, Kok Li
Published: (2006)