Investigation on problems, issues and challenges of project management on marine concrete repair at TNB's power plant : a case study
Saved in:
Main Author: | Md. Isa, Ahmad Hishamuddin |
---|---|
Format: | Thesis |
Published: |
2004
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Management related issues and challenges in steel pile repair works in marine structure : case study on the Sultan Salahuddin Abdul Aziz Power Plant in Kapar, Selangor
by: Alagusundaram, Balasubramaniam
Published: (2004) -
Issues and challenges in construction of roller compacted concrete dam in Malaysia
by: Zulkifli, Assrul Reedza
Published: (2013) -
Safety evaluation of bakun concrete faced rockfill dam
by: Ahmad, Hilton @ Mohd Hilton
Published: (2006) -
The scouring of shell fragments seabed beneath marine pipelines
by: Jaffar Sidek, Faridah
Published: (1991) -
Marine microbial diversity of off-Terengganu coastal sediment in South China Sea
by: Zahar, Marziah
Published: (2017)