Analysis of factors of non-excusable delays that influence contractors' performance
Saved in:
Main Author: | Ng, Weng Seng |
---|---|
Format: | Thesis |
Published: |
2001
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Excusable delays in construction (A case study)
by: Ahmed Memon, Zubair
Published: (2000) -
An analysis of the causes of non-excusable delays by contractor for public projects in Sarawak/ Mohamad Rafiq Mohamad Radzuan
by: Mohamad Radzuan, Mohamad Rafiq
Published: (2020) -
Client satisfaction on contractors' work performance
by: Adanan, Hadiatul Aida
Published: (2006) -
Challenges face by Malaysian contractors in international ventures
by: Abu Bakar, Zaradiah
Published: (2008) -
Success factors for bumiputra contractors in Malaysia : Johor state
by: Rahmat, Noor Idirah
Published: (2016)