Reviewing the project delivery systems used in Malaysia Construction Industry : focus on the conventional method and the design and build method
Saved in:
Main Author: | Tee, Beng Hock |
---|---|
Format: | Thesis |
Published: |
2000
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Comparing conventional to industrialised building system construction costing : a case study of school building projects
by: Abdul Aziz, Zuraidah
Published: (2012) -
Monitoring and control methods for construction projects
by: Shanmugam, Arvindran
Published: (2004) -
The comparison between conventional and industrialized building system formwork towards sustainable construction
by: Mohd Bakri, Muhammad Hassan
Published: (2008) -
Reverse logistic for industrial building system construction project
by: Buniya, Mohanad Kamil
Published: (2014) -
The effect of different industrialized building system (IBS) construction methods compared to the conventional method on occupational safety and health (OSH) industry risks in construction
by: Mohd Amin, Mohamad Ariff
Published: (2021)