Strategies to improve berth turnaround time of mainline container ships calling at Port Klang : case study : Klang Container Terminal (KCT)
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Published: |
1996
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my-utm-ep.44160 |
---|---|
record_format |
uketd_dc |
spelling |
my-utm-ep.441602017-10-09T06:22:19Z Strategies to improve berth turnaround time of mainline container ships calling at Port Klang : case study : Klang Container Terminal (KCT) 1996 Krishnan, K. Surendran Kutty HE Transportation and Communications 1996 Thesis http://eprints.utm.my/id/eprint/44160/ masters Universiti Teknologi Malaysia, Faculty of Built Environment Faculty of Built Environment |
institution |
Universiti Teknologi Malaysia |
collection |
UTM Institutional Repository |
topic |
HE Transportation and Communications |
spellingShingle |
HE Transportation and Communications Krishnan, K. Surendran Kutty Strategies to improve berth turnaround time of mainline container ships calling at Port Klang : case study : Klang Container Terminal (KCT) |
description |
|
format |
Thesis |
qualification_level |
Master's degree |
author |
Krishnan, K. Surendran Kutty |
author_facet |
Krishnan, K. Surendran Kutty |
author_sort |
Krishnan, K. Surendran Kutty |
title |
Strategies to improve berth turnaround time of mainline container ships calling at Port Klang : case study : Klang Container Terminal (KCT) |
title_short |
Strategies to improve berth turnaround time of mainline container ships calling at Port Klang : case study : Klang Container Terminal (KCT) |
title_full |
Strategies to improve berth turnaround time of mainline container ships calling at Port Klang : case study : Klang Container Terminal (KCT) |
title_fullStr |
Strategies to improve berth turnaround time of mainline container ships calling at Port Klang : case study : Klang Container Terminal (KCT) |
title_full_unstemmed |
Strategies to improve berth turnaround time of mainline container ships calling at Port Klang : case study : Klang Container Terminal (KCT) |
title_sort |
strategies to improve berth turnaround time of mainline container ships calling at port klang : case study : klang container terminal (kct) |
granting_institution |
Universiti Teknologi Malaysia, Faculty of Built Environment |
granting_department |
Faculty of Built Environment |
publishDate |
1996 |
_version_ |
1747817158278119424 |