The effects of procurement methods on performance of construction projects in Malaysia

محفوظ في:
التفاصيل البيبلوغرافية
المؤلف الرئيسي: Hashim, Maizon
التنسيق: أطروحة
منشور في: 1999
الموضوعات:
الوسوم: إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
id my-utm-ep.44206
record_format uketd_dc
spelling my-utm-ep.442062015-02-25T01:21:35Z The effects of procurement methods on performance of construction projects in Malaysia 1999 Hashim, Maizon TH Building construction 1999 Thesis http://eprints.utm.my/id/eprint/44206/ phd doctoral Universiti Teknologi Malaysia, Faculty of Mechanical Engineering Faculty of Mechanical Engineering
institution Universiti Teknologi Malaysia
collection UTM Institutional Repository
topic TH Building construction
spellingShingle TH Building construction
Hashim, Maizon
The effects of procurement methods on performance of construction projects in Malaysia
description
format Thesis
qualification_name Doctor of Philosophy (PhD.)
qualification_level Doctorate
author Hashim, Maizon
author_facet Hashim, Maizon
author_sort Hashim, Maizon
title The effects of procurement methods on performance of construction projects in Malaysia
title_short The effects of procurement methods on performance of construction projects in Malaysia
title_full The effects of procurement methods on performance of construction projects in Malaysia
title_fullStr The effects of procurement methods on performance of construction projects in Malaysia
title_full_unstemmed The effects of procurement methods on performance of construction projects in Malaysia
title_sort effects of procurement methods on performance of construction projects in malaysia
granting_institution Universiti Teknologi Malaysia, Faculty of Mechanical Engineering
granting_department Faculty of Mechanical Engineering
publishDate 1999
_version_ 1747817169222107136