Kajian terhadap projek perumahan di Kelantan

The housing projects in Kelantan are not only constructed by the government but also by the private sectors. In Kelantan, the private sectors are facing problems whereby they are unable to sell the houses to the non bumiputeras. This is due to the government policy that the land title and houses is...

Full description

Saved in:
Bibliographic Details
Main Author: Che Ibrahim, Nor Adilah
Format: Thesis
Language:English
Published: 2005
Subjects:
Online Access:http://eprints.utm.my/id/eprint/4445/1/NorAdilahCheIbrahimMFKA2005.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-utm-ep.4445
record_format uketd_dc
spelling my-utm-ep.44452018-01-28T07:33:58Z Kajian terhadap projek perumahan di Kelantan 2005-05 Che Ibrahim, Nor Adilah TA Engineering (General). Civil engineering (General) The housing projects in Kelantan are not only constructed by the government but also by the private sectors. In Kelantan, the private sectors are facing problems whereby they are unable to sell the houses to the non bumiputeras. This is due to the government policy that the land title and houses is only for the people in Kelantan. The objectives of this study are to identify the process of State Land application in Kelantan, to identify the approval process in selling housing units to non bumiputeras, to identify the factors contributing to the failure in selling housing units to bumiputeras in Kelantan and lastly to identify the preferable housing price range affordable among the bumiputeras in Kelantan. The scope of this study is focused on housing projects in Kelantan. The literature review consists of housing in Malaysia, the parties that are involved in housing industry, the laws which are related to the housing industry, feasibility study, the importance of feasibility study, scope and approaches in feasibility study, housing loan and problems of surplus in housing industry. The methodologies that have being used are literature review, pilot study and data analysis. The mean index method using SPSS is also being used to analyze the data. From the study, the approval process in selling housing units to non-bumiputeras takes about 6 to 12 months to be processed. The housing price rang affordable is between RM 46,000 to RM 90,000. 2005-05 Thesis http://eprints.utm.my/id/eprint/4445/ http://eprints.utm.my/id/eprint/4445/1/NorAdilahCheIbrahimMFKA2005.pdf application/pdf en public masters Universiti Teknologi Malaysia, Faculty of Civil Engineering Faculty of Civil Engineering
institution Universiti Teknologi Malaysia
collection UTM Institutional Repository
language English
topic TA Engineering (General)
Civil engineering (General)
spellingShingle TA Engineering (General)
Civil engineering (General)
Che Ibrahim, Nor Adilah
Kajian terhadap projek perumahan di Kelantan
description The housing projects in Kelantan are not only constructed by the government but also by the private sectors. In Kelantan, the private sectors are facing problems whereby they are unable to sell the houses to the non bumiputeras. This is due to the government policy that the land title and houses is only for the people in Kelantan. The objectives of this study are to identify the process of State Land application in Kelantan, to identify the approval process in selling housing units to non bumiputeras, to identify the factors contributing to the failure in selling housing units to bumiputeras in Kelantan and lastly to identify the preferable housing price range affordable among the bumiputeras in Kelantan. The scope of this study is focused on housing projects in Kelantan. The literature review consists of housing in Malaysia, the parties that are involved in housing industry, the laws which are related to the housing industry, feasibility study, the importance of feasibility study, scope and approaches in feasibility study, housing loan and problems of surplus in housing industry. The methodologies that have being used are literature review, pilot study and data analysis. The mean index method using SPSS is also being used to analyze the data. From the study, the approval process in selling housing units to non-bumiputeras takes about 6 to 12 months to be processed. The housing price rang affordable is between RM 46,000 to RM 90,000.
format Thesis
qualification_level Master's degree
author Che Ibrahim, Nor Adilah
author_facet Che Ibrahim, Nor Adilah
author_sort Che Ibrahim, Nor Adilah
title Kajian terhadap projek perumahan di Kelantan
title_short Kajian terhadap projek perumahan di Kelantan
title_full Kajian terhadap projek perumahan di Kelantan
title_fullStr Kajian terhadap projek perumahan di Kelantan
title_full_unstemmed Kajian terhadap projek perumahan di Kelantan
title_sort kajian terhadap projek perumahan di kelantan
granting_institution Universiti Teknologi Malaysia, Faculty of Civil Engineering
granting_department Faculty of Civil Engineering
publishDate 2005
url http://eprints.utm.my/id/eprint/4445/1/NorAdilahCheIbrahimMFKA2005.pdf
_version_ 1747814529703608320