Analisis kesan pemendekan jadual kerja terhadap kos projek
Saved in:
主要作者: | |
---|---|
格式: | Thesis |
出版: |
1999
|
主題: | |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
id |
my-utm-ep.44453 |
---|---|
record_format |
uketd_dc |
spelling |
my-utm-ep.444532015-02-25T01:21:26Z Analisis kesan pemendekan jadual kerja terhadap kos projek 1999 A. Luthan, Putri Lynna HD Industries. Land use. Labor 1999 Thesis http://eprints.utm.my/id/eprint/44453/ masters Universiti Teknologi Malaysia, Faculty of Civil Engineering Faculty of Civil Engineering |
institution |
Universiti Teknologi Malaysia |
collection |
UTM Institutional Repository |
topic |
HD Industries Land use Labor |
spellingShingle |
HD Industries Land use Labor A. Luthan, Putri Lynna Analisis kesan pemendekan jadual kerja terhadap kos projek |
description |
|
format |
Thesis |
qualification_level |
Master's degree |
author |
A. Luthan, Putri Lynna |
author_facet |
A. Luthan, Putri Lynna |
author_sort |
A. Luthan, Putri Lynna |
title |
Analisis kesan pemendekan jadual kerja terhadap kos projek |
title_short |
Analisis kesan pemendekan jadual kerja terhadap kos projek |
title_full |
Analisis kesan pemendekan jadual kerja terhadap kos projek |
title_fullStr |
Analisis kesan pemendekan jadual kerja terhadap kos projek |
title_full_unstemmed |
Analisis kesan pemendekan jadual kerja terhadap kos projek |
title_sort |
analisis kesan pemendekan jadual kerja terhadap kos projek |
granting_institution |
Universiti Teknologi Malaysia, Faculty of Civil Engineering |
granting_department |
Faculty of Civil Engineering |
publishDate |
1999 |
_version_ |
1747817229329629184 |