Analisis kesan pemendekan jadual kerja terhadap kos projek

Saved in:
书目详细资料
主要作者: A. Luthan, Putri Lynna
格式: Thesis
出版: 1999
主题:
标签: 添加标签
没有标签, 成为第一个标记此记录!
id my-utm-ep.44453
record_format uketd_dc
spelling my-utm-ep.444532015-02-25T01:21:26Z Analisis kesan pemendekan jadual kerja terhadap kos projek 1999 A. Luthan, Putri Lynna HD Industries. Land use. Labor 1999 Thesis http://eprints.utm.my/id/eprint/44453/ masters Universiti Teknologi Malaysia, Faculty of Civil Engineering Faculty of Civil Engineering
institution Universiti Teknologi Malaysia
collection UTM Institutional Repository
topic HD Industries
Land use
Labor
spellingShingle HD Industries
Land use
Labor
A. Luthan, Putri Lynna
Analisis kesan pemendekan jadual kerja terhadap kos projek
description
format Thesis
qualification_level Master's degree
author A. Luthan, Putri Lynna
author_facet A. Luthan, Putri Lynna
author_sort A. Luthan, Putri Lynna
title Analisis kesan pemendekan jadual kerja terhadap kos projek
title_short Analisis kesan pemendekan jadual kerja terhadap kos projek
title_full Analisis kesan pemendekan jadual kerja terhadap kos projek
title_fullStr Analisis kesan pemendekan jadual kerja terhadap kos projek
title_full_unstemmed Analisis kesan pemendekan jadual kerja terhadap kos projek
title_sort analisis kesan pemendekan jadual kerja terhadap kos projek
granting_institution Universiti Teknologi Malaysia, Faculty of Civil Engineering
granting_department Faculty of Civil Engineering
publishDate 1999
_version_ 1747817229329629184