Scheduling on transportation for industrialized building systems

Now, the construction is facing the challenges from the four main aspects, which are quality, cost, time and safety. However, by implementing the industrialized building system (IBS), all those challenges can be faced easily. In this study, double storey shop houses will be used as a model to illust...

Full description

Saved in:
Bibliographic Details
Main Author: Foong, Kok Li
Format: Thesis
Language:English
Published: 2006
Subjects:
Online Access:http://eprints.utm.my/id/eprint/4582/1/FoongKokLiMFKA2006.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-utm-ep.4582
record_format uketd_dc
spelling my-utm-ep.45822018-02-26T06:12:01Z Scheduling on transportation for industrialized building systems 2006-04 Foong, Kok Li TH Building construction TA Engineering (General). Civil engineering (General) Now, the construction is facing the challenges from the four main aspects, which are quality, cost, time and safety. However, by implementing the industrialized building system (IBS), all those challenges can be faced easily. In this study, double storey shop houses will be used as a model to illustrate the management of IBS transportation for fabricators. Besides, the number of trucks required each day will be discussed here based on proper scheduling using project management software. Other than that, this study focuses on the scheduling by optimization. This project highlights a proper management of the trucks used in the delivery of IBS components for construction. 2006-04 Thesis http://eprints.utm.my/id/eprint/4582/ http://eprints.utm.my/id/eprint/4582/1/FoongKokLiMFKA2006.pdf application/pdf en public masters Universiti Teknologi Malaysia, Faculty of Civil Engineering Faculty of Civil Engineering
institution Universiti Teknologi Malaysia
collection UTM Institutional Repository
language English
topic TH Building construction
TH Building construction
spellingShingle TH Building construction
TH Building construction
Foong, Kok Li
Scheduling on transportation for industrialized building systems
description Now, the construction is facing the challenges from the four main aspects, which are quality, cost, time and safety. However, by implementing the industrialized building system (IBS), all those challenges can be faced easily. In this study, double storey shop houses will be used as a model to illustrate the management of IBS transportation for fabricators. Besides, the number of trucks required each day will be discussed here based on proper scheduling using project management software. Other than that, this study focuses on the scheduling by optimization. This project highlights a proper management of the trucks used in the delivery of IBS components for construction.
format Thesis
qualification_level Master's degree
author Foong, Kok Li
author_facet Foong, Kok Li
author_sort Foong, Kok Li
title Scheduling on transportation for industrialized building systems
title_short Scheduling on transportation for industrialized building systems
title_full Scheduling on transportation for industrialized building systems
title_fullStr Scheduling on transportation for industrialized building systems
title_full_unstemmed Scheduling on transportation for industrialized building systems
title_sort scheduling on transportation for industrialized building systems
granting_institution Universiti Teknologi Malaysia, Faculty of Civil Engineering
granting_department Faculty of Civil Engineering
publishDate 2006
url http://eprints.utm.my/id/eprint/4582/1/FoongKokLiMFKA2006.pdf
_version_ 1747814535337607168