Scheduling on transportation for industrialized building systems
Now, the construction is facing the challenges from the four main aspects, which are quality, cost, time and safety. However, by implementing the industrialized building system (IBS), all those challenges can be faced easily. In this study, double storey shop houses will be used as a model to illust...
Saved in:
主要作者: | |
---|---|
格式: | Thesis |
語言: | English |
出版: |
2006
|
主題: | |
在線閱讀: | http://eprints.utm.my/id/eprint/4582/1/FoongKokLiMFKA2006.pdf |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|