Scheduling on transportation for industrialized building systems
Now, the construction is facing the challenges from the four main aspects, which are quality, cost, time and safety. However, by implementing the industrialized building system (IBS), all those challenges can be faced easily. In this study, double storey shop houses will be used as a model to illust...
محفوظ في:
المؤلف الرئيسي: | Foong, Kok Li |
---|---|
التنسيق: | أطروحة |
اللغة: | English |
منشور في: |
2006
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://eprints.utm.my/id/eprint/4582/1/FoongKokLiMFKA2006.pdf |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
مواد مشابهة
-
Industrialised building system formation scheduling for public buildings
بواسطة: Tay, Allan Eng Mian
منشور في: (2006) -
Effectiveness of industrialised building system (IBS) implementation for Malaysian Construction Industry
بواسطة: Zawawi, Mardhiah
منشور في: (2009) -
The implementation of Industrialized Building System (IBS) in the perception of contractors / Nur Eirdhina Nor Hashim
بواسطة: Nor Hashim, Nur Eirdhina
منشور في: (2023) -
The implementation of design and build procurement approach in local construction industry
بواسطة: Pang, Sheh Haur
منشور في: (2003) -
Building information modeling in planning and scheduling phase in Iran
بواسطة: Ghomi, Saeid Khalili
منشور في: (2013)