Construction of precast segmental box girder bridge using overhead gantry - a case study

The bridge construction utilizing the concept of erecting the precast segmental panel has been a chosen method for bridge construction within restricted area. This method has been successfully exhibit the constructability within the urban area and also crossing the wide water body, valley and existi...

Full description

Saved in:
Bibliographic Details
Main Author: Salleh @ Mohamed Salleh, Jazlan
Format: Thesis
Language:English
Published: 2006
Subjects:
Online Access:http://eprints.utm.my/id/eprint/4586/1/JazlanSallehMFKA2006.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-utm-ep.4586
record_format uketd_dc
spelling my-utm-ep.45862018-02-26T06:12:11Z Construction of precast segmental box girder bridge using overhead gantry - a case study 2006-11 Salleh @ Mohamed Salleh, Jazlan TA Engineering (General). Civil engineering (General) The bridge construction utilizing the concept of erecting the precast segmental panel has been a chosen method for bridge construction within restricted area. This method has been successfully exhibit the constructability within the urban area and also crossing the wide water body, valley and existing highway or railroad. The suitability of this method of construction is depending on the availability of working space, which govern the major cause in selection of this construction method. The aim and objective are to study the problem in the manufacturing the segment and segment erection. This master project has studied the procedures in construction of precast segmental box girder bridge by balance cantilever method using the overhead gantry. This project also studied the segment manufacturing procedures and discovers some problem problems faced in segment manufacturing that is interesting and need to expose for awareness to the bridge professional. The segment erection procedures and sequence also has been studied and the related problems have been highlighted and need further study by the professional bridge designers and constructors. The study has been conducted by direct structured interview and questionnaire with the bridge expertise. The bridge professional from consultants, segment manufacturer, main contractors and specialist sub contractor have shared their knowledge, technical know-how and experience and has been elaborated in details in this project. The finding is very interesting and it has exposed the problem related to the segmental bridge construction that need further study by the bridge expertise. This study also recommended some idea about working concurrently and simultaneously without fragmentation that could lead to errors. It is expected that by addressing the problem at early stage could assist the designer, manufacturer and constructor to foresee the problem and find the mitigation measures thus could eliminate the errors that may occurs in manufacturing the segment and erection on site. 2006-11 Thesis http://eprints.utm.my/id/eprint/4586/ http://eprints.utm.my/id/eprint/4586/1/JazlanSallehMFKA2006.pdf application/pdf en public masters Universiti Teknologi Malaysia, Faculty of Civil Engineering Faculty of Civil Engineering
institution Universiti Teknologi Malaysia
collection UTM Institutional Repository
language English
topic TA Engineering (General)
Civil engineering (General)
spellingShingle TA Engineering (General)
Civil engineering (General)
Salleh @ Mohamed Salleh, Jazlan
Construction of precast segmental box girder bridge using overhead gantry - a case study
description The bridge construction utilizing the concept of erecting the precast segmental panel has been a chosen method for bridge construction within restricted area. This method has been successfully exhibit the constructability within the urban area and also crossing the wide water body, valley and existing highway or railroad. The suitability of this method of construction is depending on the availability of working space, which govern the major cause in selection of this construction method. The aim and objective are to study the problem in the manufacturing the segment and segment erection. This master project has studied the procedures in construction of precast segmental box girder bridge by balance cantilever method using the overhead gantry. This project also studied the segment manufacturing procedures and discovers some problem problems faced in segment manufacturing that is interesting and need to expose for awareness to the bridge professional. The segment erection procedures and sequence also has been studied and the related problems have been highlighted and need further study by the professional bridge designers and constructors. The study has been conducted by direct structured interview and questionnaire with the bridge expertise. The bridge professional from consultants, segment manufacturer, main contractors and specialist sub contractor have shared their knowledge, technical know-how and experience and has been elaborated in details in this project. The finding is very interesting and it has exposed the problem related to the segmental bridge construction that need further study by the bridge expertise. This study also recommended some idea about working concurrently and simultaneously without fragmentation that could lead to errors. It is expected that by addressing the problem at early stage could assist the designer, manufacturer and constructor to foresee the problem and find the mitigation measures thus could eliminate the errors that may occurs in manufacturing the segment and erection on site.
format Thesis
qualification_level Master's degree
author Salleh @ Mohamed Salleh, Jazlan
author_facet Salleh @ Mohamed Salleh, Jazlan
author_sort Salleh @ Mohamed Salleh, Jazlan
title Construction of precast segmental box girder bridge using overhead gantry - a case study
title_short Construction of precast segmental box girder bridge using overhead gantry - a case study
title_full Construction of precast segmental box girder bridge using overhead gantry - a case study
title_fullStr Construction of precast segmental box girder bridge using overhead gantry - a case study
title_full_unstemmed Construction of precast segmental box girder bridge using overhead gantry - a case study
title_sort construction of precast segmental box girder bridge using overhead gantry - a case study
granting_institution Universiti Teknologi Malaysia, Faculty of Civil Engineering
granting_department Faculty of Civil Engineering
publishDate 2006
url http://eprints.utm.my/id/eprint/4586/1/JazlanSallehMFKA2006.pdf
_version_ 1747814536302297088