Case study to determine the camber of post- tensioned 'I' beam
A common problem that most contractors faced in beam bridge construction was to predict the actual camber of pre-tensioned or post-tensioned beams due to prestressing in order to achieve bridge design finished levels without any unforeseen additional construction cost. Four numbers of full scale 36m...
Saved in:
Main Author: | Lee, Poh Huat |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2005
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/4589/1/LeePohHuatMFKA2005.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Geometric parametric study on concrete beam bridge
by: Nge, Siew Boon
Published: (2001) -
Modelling of steel-concrete composite beam sections of bridges using finite element method
by: Safiee, Nor Azizi
Published: (2004) -
Modal analysis of concrete bridge decks subjected to free vibration
by: Mohamad Bhkari, Norshariza
Published: (2005) -
Comparison of bridge design in Malaysia between American codes and British codes
by: Wan Ahmad Kamal, Wan Ikram Wajdee
Published: (2005) -
Construction of multiple design and build bridge projects: case study in Sabah
by: Chidambaram Ramanathan
Published: (2008)