Case study to determine the camber of post- tensioned 'I' beam

A common problem that most contractors faced in beam bridge construction was to predict the actual camber of pre-tensioned or post-tensioned beams due to prestressing in order to achieve bridge design finished levels without any unforeseen additional construction cost. Four numbers of full scale 36m...

全面介紹

Saved in:
書目詳細資料
主要作者: Lee, Poh Huat
格式: Thesis
語言:English
出版: 2005
主題:
在線閱讀:http://eprints.utm.my/id/eprint/4589/1/LeePohHuatMFKA2005.pdf
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!