Comparative stiffness analysis between conventional and IBS construction method
Industrialised Building System (IBS) is a system where the components such as beam, columns and floors are produced in the factory with standard sizes and length. These components are then transported to the construction site for assembly to form buildings. The analysis and design of the IBS structu...
Saved in:
主要作者: | Hashim, Md. Nasir |
---|---|
格式: | Thesis |
语言: | English |
出版: |
2006
|
主题: | |
在线阅读: | http://eprints.utm.my/id/eprint/4592/1/MdNasirHashimMFKA2006.pdf |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|
相似书籍
-
Constructability comparison between IBS and conventional construction
由: Harirchian, Ehsan
出版: (2015) -
Construction waste generated in conventional method of housing construction
由: Ong, Eng Guan
出版: (2009) -
Factors influence construction time performance for IBS in Malaysia Construction Industry
由: Salahuddin, Siti Nur Hafizeanie
出版: (2010) -
Analysis of extendable IBS steel truss
由: Liew, Vui Jen
出版: (2008) -
Effectiveness of industrialised building system (IBS) implementation for Malaysian construction industry
由: Zawawi, Mardhiah
出版: (2009)