Overtime in minimizing construction delay

One of the significant problems in construction industry is delay. Construction projects frequently suffer delays and completed later than agreed time? Amongst various efforts, overtime has frequently become the planned schedule from the onset of a project to overcome delay in project. This study ai...

Full description

Saved in:
Bibliographic Details
Main Author: Saari, Syahmi
Format: Thesis
Language:English
Published: 2014
Subjects:
Online Access:http://eprints.utm.my/id/eprint/48558/1/SyahmiBinSaariMFKA2014.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-utm-ep.48558
record_format uketd_dc
spelling my-utm-ep.485582017-08-13T01:44:56Z Overtime in minimizing construction delay 2014 Saari, Syahmi TA Engineering (General). Civil engineering (General) One of the significant problems in construction industry is delay. Construction projects frequently suffer delays and completed later than agreed time? Amongst various efforts, overtime has frequently become the planned schedule from the onset of a project to overcome delay in project. This study aims to analyse the effectiveness of overtime work in addressing problem of delay in construction project. The study identified that excavation and concreting work required the overtime work. Based on the study, overtime can be used to minimize the construction delay but overtime can be efficient way to minimizing delay by application of some methods of managing overtime in the project management. The most efficient methods can be adopt in the project are time management and scheduling management. 2014 Thesis http://eprints.utm.my/id/eprint/48558/ http://eprints.utm.my/id/eprint/48558/1/SyahmiBinSaariMFKA2014.pdf application/pdf en public http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:81463?queryType=vitalDismax&query=Overtime+in+minimizing+construction+delay&public=true masters Universiti Teknologi Malaysia, Faculty of Civil Engineering Faculty of Civil Engineering
institution Universiti Teknologi Malaysia
collection UTM Institutional Repository
language English
topic TA Engineering (General)
Civil engineering (General)
spellingShingle TA Engineering (General)
Civil engineering (General)
Saari, Syahmi
Overtime in minimizing construction delay
description One of the significant problems in construction industry is delay. Construction projects frequently suffer delays and completed later than agreed time? Amongst various efforts, overtime has frequently become the planned schedule from the onset of a project to overcome delay in project. This study aims to analyse the effectiveness of overtime work in addressing problem of delay in construction project. The study identified that excavation and concreting work required the overtime work. Based on the study, overtime can be used to minimize the construction delay but overtime can be efficient way to minimizing delay by application of some methods of managing overtime in the project management. The most efficient methods can be adopt in the project are time management and scheduling management.
format Thesis
qualification_level Master's degree
author Saari, Syahmi
author_facet Saari, Syahmi
author_sort Saari, Syahmi
title Overtime in minimizing construction delay
title_short Overtime in minimizing construction delay
title_full Overtime in minimizing construction delay
title_fullStr Overtime in minimizing construction delay
title_full_unstemmed Overtime in minimizing construction delay
title_sort overtime in minimizing construction delay
granting_institution Universiti Teknologi Malaysia, Faculty of Civil Engineering
granting_department Faculty of Civil Engineering
publishDate 2014
url http://eprints.utm.my/id/eprint/48558/1/SyahmiBinSaariMFKA2014.pdf
_version_ 1747817419753127936