Consultant architect’s diligence in rail infrastructure project

Rail infrastructure is part of construction works. Rail infrastructure is the building components that support the operation of trains.It can be very complicated and complex task. Often rail infrastructure projects by Prasarana is inundated with problems in term of design adequacies. Architect’s are...

Full description

Saved in:
Bibliographic Details
Main Author: Ariffin, Shams Arida
Format: Thesis
Language:English
Published: 2014
Subjects:
Online Access:http://eprints.utm.my/id/eprint/48862/25/ShamsAridaAriffinMFAB2014.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-utm-ep.48862
record_format uketd_dc
spelling my-utm-ep.488622020-07-01T07:41:20Z Consultant architect’s diligence in rail infrastructure project 2014-06 Ariffin, Shams Arida TF Railroad engineering and operation Rail infrastructure is part of construction works. Rail infrastructure is the building components that support the operation of trains.It can be very complicated and complex task. Often rail infrastructure projects by Prasarana is inundated with problems in term of design adequacies. Architect’s are not providing enough design input while at the same time Prasarana are not happy with the product that they got. The problem is architect do not realise that they are obliged to comply fully with the Employer’s design brief. Thus, the objective of the study is to identify the responsibility of architects based on relevant case laws and to develop guidelines that will ensure compliance of design brief by architect. The study established ten conditions that relate to architect’s duties. The scope of study is limited to rail infrastructure projects by Prasarana completed between year 2010 to 2013. The projects itself are carpark complexes and pedestrian walkways are all using consultancy services which is now completed. The significance of this study is that it will be used by Prasarana in conducting better project governance. Methodology used for the study is documentary analysis which resulted in descriptive findings and comparison of cases. Further method includes interviews and reference to journals and articles. The study suggested that architects, while managing construction of rail infrastructure, could be held liable for any defects or inadequacies in designing and in terms of service level provided to the client. The study may contribute towards the enhancement of knowledge within the architect’s community with regards to design diligence in rail infrastructure which also involves construction law. 2014-06 Thesis http://eprints.utm.my/id/eprint/48862/ http://eprints.utm.my/id/eprint/48862/25/ShamsAridaAriffinMFAB2014.pdf application/pdf en public http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:86750 masters Universiti Teknologi Malaysia, Faculty of Built Environment Faculty of Built Environment
institution Universiti Teknologi Malaysia
collection UTM Institutional Repository
language English
topic TF Railroad engineering and operation
spellingShingle TF Railroad engineering and operation
Ariffin, Shams Arida
Consultant architect’s diligence in rail infrastructure project
description Rail infrastructure is part of construction works. Rail infrastructure is the building components that support the operation of trains.It can be very complicated and complex task. Often rail infrastructure projects by Prasarana is inundated with problems in term of design adequacies. Architect’s are not providing enough design input while at the same time Prasarana are not happy with the product that they got. The problem is architect do not realise that they are obliged to comply fully with the Employer’s design brief. Thus, the objective of the study is to identify the responsibility of architects based on relevant case laws and to develop guidelines that will ensure compliance of design brief by architect. The study established ten conditions that relate to architect’s duties. The scope of study is limited to rail infrastructure projects by Prasarana completed between year 2010 to 2013. The projects itself are carpark complexes and pedestrian walkways are all using consultancy services which is now completed. The significance of this study is that it will be used by Prasarana in conducting better project governance. Methodology used for the study is documentary analysis which resulted in descriptive findings and comparison of cases. Further method includes interviews and reference to journals and articles. The study suggested that architects, while managing construction of rail infrastructure, could be held liable for any defects or inadequacies in designing and in terms of service level provided to the client. The study may contribute towards the enhancement of knowledge within the architect’s community with regards to design diligence in rail infrastructure which also involves construction law.
format Thesis
qualification_level Master's degree
author Ariffin, Shams Arida
author_facet Ariffin, Shams Arida
author_sort Ariffin, Shams Arida
title Consultant architect’s diligence in rail infrastructure project
title_short Consultant architect’s diligence in rail infrastructure project
title_full Consultant architect’s diligence in rail infrastructure project
title_fullStr Consultant architect’s diligence in rail infrastructure project
title_full_unstemmed Consultant architect’s diligence in rail infrastructure project
title_sort consultant architect’s diligence in rail infrastructure project
granting_institution Universiti Teknologi Malaysia, Faculty of Built Environment
granting_department Faculty of Built Environment
publishDate 2014
url http://eprints.utm.my/id/eprint/48862/25/ShamsAridaAriffinMFAB2014.pdf
_version_ 1747817489903910912