Development of common work breakdown structure (WBS) for school project

A lot have been said about delayed school projects. Among the main factors that contribute to the problem are lacking of experience among the contractor, adopting non suitable and non detailed scheduling method for project monitoring. Ministry of Works and The Ministry of Education are two main bodi...

Full description

Saved in:
Bibliographic Details
Main Author: Abdullah, Azhar
Format: Thesis
Language:English
Published: 2006
Subjects:
Online Access:http://eprints.utm.my/id/eprint/4892/1/AzharAbdullahMFKA2006.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!