Basis in ascertaining the amount of liquidated damages
In Malaysian construction industry, one of the conditions in the contract made between the employer and contractor is to complete a project within a specified time. Failure to fulfil the condition will amount to breach of contract. Main remedy available for breach of contract is an award of damages....
Saved in:
Main Author: | Azman, Ili Liyana |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2014
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/48929/25/IliLiyanaAzmanFAB2014.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Liquidated and ascertained damages (LAD) and requirements of mitigation
by: Yong, Mei Lee
Published: (2006) -
The enforceability of liquidated and ascertained damages in construction contract
by: Chia, Eunice Mei Ling
Published: (2009) -
Notice condition precedent to claim liquidated ascertained damages (LAD)
by: Mansor, Nur Syaimasyaza
Published: (2011) -
Enforceability of the liquidated and ascertained damages and effect of section 75 contracts ACT 1950
by: Mohamad, Shazlimanshah
Published: (2019) -
Natural justice in adjudication
by: Ling, Tek Lee
Published: (2006)