Contractor's liability to third party for defective works
In recent times, there have been increasing incidents of defective work in Malaysia and elsewhere due shoddy workmanship, cheating and sometimes, design errors. The consequences could be catastrophic and fatal as in collapsing buildings, and sometimes less dramatic, but no less catastrophic from a f...
Saved in:
Main Author: | Mohmad Zainordi, Zainab |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2006
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/4997/1/ZainabMohamadZainordinMFAB2006.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Contractor's liability relating to defective works that are discovered after the defects liability period
by: Leong, Mei Wan
Published: (2010) -
Contractor's liabilities towards employer's defective building work claims during defect liability period
by: Lim, Tze Shwan
Published: (2011) -
Employer's rights and contractor's liabilities in relation to construction defects after final certificate
by: Tan, Pei Ling
Published: (2007) -
Third party funding for arbitration in Malaysia
by: Leong, Chun Yen
Published: (2016) -
Contractor’s liability under unforeseen ground conditions
by: Permana, Assad Idea
Published: (2015)