Implementation strategy for industrialised building system
In Malaysia, the implementation of Industrialised Building System (IBS) by using precast concrete elements were introduced since 1966 when the government launched two pilot projects in 1966 which involves the construction of Tuanku Abdul Rahman Flats in Kuala Lumpur and the Rifle Range Road Flats in...
Saved in:
主要作者: | |
---|---|
格式: | Thesis |
語言: | English |
出版: |
2006
|
主題: | |
在線閱讀: | http://eprints.utm.my/id/eprint/5058/1/LimPuiChungMFKA2006.pdf |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
成為第一個發表評論!