Implementation strategy for industrialised building system
In Malaysia, the implementation of Industrialised Building System (IBS) by using precast concrete elements were introduced since 1966 when the government launched two pilot projects in 1966 which involves the construction of Tuanku Abdul Rahman Flats in Kuala Lumpur and the Rifle Range Road Flats in...
Saved in:
主要作者: | |
---|---|
格式: | Thesis |
语言: | English |
出版: |
2006
|
主题: | |
在线阅读: | http://eprints.utm.my/id/eprint/5058/1/LimPuiChungMFKA2006.pdf |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|
成为第一个发表评论!