Assessment of loss and expense for extension of time

Delays are fairly common place during the construction process. Contract delays are classified as excusable, inexcusable or compensable. Excusable delays are those which are determined to be unforeseeable and uncontrollable by the contractor, inexcusable delays are not compensable for time or money...

Full description

Saved in:
Bibliographic Details
Main Author: Mohd. Said, Sorfina ‘Izzati
Format: Thesis
Language:English
Published: 2014
Subjects:
Online Access:http://eprints.utm.my/id/eprint/50694/25/Sorfina%E2%80%98IzzatiMohdSaidMFAB2014.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-utm-ep.50694
record_format uketd_dc
spelling my-utm-ep.506942020-07-08T08:44:49Z Assessment of loss and expense for extension of time 2014-06 Mohd. Said, Sorfina ‘Izzati TH Building construction Delays are fairly common place during the construction process. Contract delays are classified as excusable, inexcusable or compensable. Excusable delays are those which are determined to be unforeseeable and uncontrollable by the contractor, inexcusable delays are not compensable for time or money since they are due to the contractors own negligence and not the responsibility of the owner and the compensable delays are those which are caused by the actions or inaction of the owner. In construction contracts will generally provide for the contractor to claim direct loss and/or expense as a result of the progress of the works being materially affected by relevant matters for which the clients responsible. These delay or extension of time can be very costly to the final expenditure of the construction projects. They can also cause problems in the administration of the projects and become sources for disputes and claims. The objectives of this research are to determine what can be claimed under loss and expense for extension of time and how they are evaluate the loss and expense for preliminaries item. The scope of the research is only limited to government construction projects. The methodology is based on the selected case studies of the government projects that used the PWD203/203A (10/83) Standard Form of Contract. For the first objective is items can be claims cause of delays is loss of profit, finance charges, overheads and loss of productivity or uneconomic working. As the second objective is to determine the methods has been used by clients in evaluate the loss and expense. In common practice there have three methods in evaluate the loss and expense; base on amendment contract basis, formula basis and negotiation basis, it depends to the contract and clients in evaluate the loss. However, it is contractor burden to proof the loss to the client with submission of evidence documents. 2014-06 Thesis http://eprints.utm.my/id/eprint/50694/ http://eprints.utm.my/id/eprint/50694/25/Sorfina%E2%80%98IzzatiMohdSaidMFAB2014.pdf application/pdf en public http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:86066 masters Universiti Teknologi Malaysia, Faculty of Built Environment Faculty of Built Environment
institution Universiti Teknologi Malaysia
collection UTM Institutional Repository
language English
topic TH Building construction
spellingShingle TH Building construction
Mohd. Said, Sorfina ‘Izzati
Assessment of loss and expense for extension of time
description Delays are fairly common place during the construction process. Contract delays are classified as excusable, inexcusable or compensable. Excusable delays are those which are determined to be unforeseeable and uncontrollable by the contractor, inexcusable delays are not compensable for time or money since they are due to the contractors own negligence and not the responsibility of the owner and the compensable delays are those which are caused by the actions or inaction of the owner. In construction contracts will generally provide for the contractor to claim direct loss and/or expense as a result of the progress of the works being materially affected by relevant matters for which the clients responsible. These delay or extension of time can be very costly to the final expenditure of the construction projects. They can also cause problems in the administration of the projects and become sources for disputes and claims. The objectives of this research are to determine what can be claimed under loss and expense for extension of time and how they are evaluate the loss and expense for preliminaries item. The scope of the research is only limited to government construction projects. The methodology is based on the selected case studies of the government projects that used the PWD203/203A (10/83) Standard Form of Contract. For the first objective is items can be claims cause of delays is loss of profit, finance charges, overheads and loss of productivity or uneconomic working. As the second objective is to determine the methods has been used by clients in evaluate the loss and expense. In common practice there have three methods in evaluate the loss and expense; base on amendment contract basis, formula basis and negotiation basis, it depends to the contract and clients in evaluate the loss. However, it is contractor burden to proof the loss to the client with submission of evidence documents.
format Thesis
qualification_level Master's degree
author Mohd. Said, Sorfina ‘Izzati
author_facet Mohd. Said, Sorfina ‘Izzati
author_sort Mohd. Said, Sorfina ‘Izzati
title Assessment of loss and expense for extension of time
title_short Assessment of loss and expense for extension of time
title_full Assessment of loss and expense for extension of time
title_fullStr Assessment of loss and expense for extension of time
title_full_unstemmed Assessment of loss and expense for extension of time
title_sort assessment of loss and expense for extension of time
granting_institution Universiti Teknologi Malaysia, Faculty of Built Environment
granting_department Faculty of Built Environment
publishDate 2014
url http://eprints.utm.my/id/eprint/50694/25/Sorfina%E2%80%98IzzatiMohdSaidMFAB2014.pdf
_version_ 1747817513654157312