Development of a pc-based tank model real-time flood forecasting system

The Upper Klang catchment has been under-going rapid development which instigated many flash flood occurrences within the catchment, especially at the Kuala Lumpur City. A reliable and timely flood forecasting system is necessary to provide early warning to minimize the destruction caused by flash f...

全面介绍

Saved in:
书目详细资料
主要作者: Cheok, Hou Seng
格式: Thesis
语言:English
出版: 2005
主题:
在线阅读:http://eprints.utm.my/id/eprint/5294/1/CheokHouSengMFKA2005.pdf
标签: 添加标签
没有标签, 成为第一个标记此记录!