Land acquisition issues for Jabatan Kerja Raya's road work project

Land acquisition issues for JKR roadwork project has often generate conflict and construction dispute for many years. If the issues can be resolved at earlier stage, this could lead to substantial financial and time savings for the projects. Therefore, this study has been undertaken to review the la...

Full description

Saved in:
Bibliographic Details
Main Author: Abu. Samaan, Noor Fazura
Format: Thesis
Language:English
Published: 2015
Subjects:
Online Access:http://eprints.utm.my/id/eprint/53521/25/NoorFazuraAbuMFKA2015.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-utm-ep.53521
record_format uketd_dc
spelling my-utm-ep.535212020-07-19T01:08:38Z Land acquisition issues for Jabatan Kerja Raya's road work project 2015-01 Abu. Samaan, Noor Fazura TA Engineering (General). Civil engineering (General) Land acquisition issues for JKR roadwork project has often generate conflict and construction dispute for many years. If the issues can be resolved at earlier stage, this could lead to substantial financial and time savings for the projects. Therefore, this study has been undertaken to review the land acquisition issues for JKR's roadwork projects. The methodology adopted for this study consist of a comprehensive review of literature, interviews with main stakeholders involved in land acquisition issue and questionnaire survey. This study was conducted using the data generated from within JKR personnel as well as other stakeholders, namely the client and consultant which involved in land acquisition stage. The finding of the study found that the major problems related to delay in land acquisition are: multiple owners in one title; owner dissatisfaction with the low compensation amount; slowness in processing the land acquisition matters; delay in removal of the existing structure of the affected land and the old record of land that has been acquired has not been updated by land office. These problems have given negative impacts toward the overall project performance such as: time and cost overrun; loss and expense claim; delay in the relocation of utility services and additional cost for rental of land. This study also determined several strategies and recommendation for improvement towards JKR's roadwork project implementation. Finally, it is hope that the findings from this study will help the JKR to improve the land acquisition process for the development of the project in the future. 2015-01 Thesis http://eprints.utm.my/id/eprint/53521/ http://eprints.utm.my/id/eprint/53521/25/NoorFazuraAbuMFKA2015.pdf application/pdf en public http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:85511 masters Universiti Teknologi Malaysia, Faculty of Civil Engineering Faculty of Civil Engineering
institution Universiti Teknologi Malaysia
collection UTM Institutional Repository
language English
topic TA Engineering (General)
Civil engineering (General)
spellingShingle TA Engineering (General)
Civil engineering (General)
Abu. Samaan, Noor Fazura
Land acquisition issues for Jabatan Kerja Raya's road work project
description Land acquisition issues for JKR roadwork project has often generate conflict and construction dispute for many years. If the issues can be resolved at earlier stage, this could lead to substantial financial and time savings for the projects. Therefore, this study has been undertaken to review the land acquisition issues for JKR's roadwork projects. The methodology adopted for this study consist of a comprehensive review of literature, interviews with main stakeholders involved in land acquisition issue and questionnaire survey. This study was conducted using the data generated from within JKR personnel as well as other stakeholders, namely the client and consultant which involved in land acquisition stage. The finding of the study found that the major problems related to delay in land acquisition are: multiple owners in one title; owner dissatisfaction with the low compensation amount; slowness in processing the land acquisition matters; delay in removal of the existing structure of the affected land and the old record of land that has been acquired has not been updated by land office. These problems have given negative impacts toward the overall project performance such as: time and cost overrun; loss and expense claim; delay in the relocation of utility services and additional cost for rental of land. This study also determined several strategies and recommendation for improvement towards JKR's roadwork project implementation. Finally, it is hope that the findings from this study will help the JKR to improve the land acquisition process for the development of the project in the future.
format Thesis
qualification_level Master's degree
author Abu. Samaan, Noor Fazura
author_facet Abu. Samaan, Noor Fazura
author_sort Abu. Samaan, Noor Fazura
title Land acquisition issues for Jabatan Kerja Raya's road work project
title_short Land acquisition issues for Jabatan Kerja Raya's road work project
title_full Land acquisition issues for Jabatan Kerja Raya's road work project
title_fullStr Land acquisition issues for Jabatan Kerja Raya's road work project
title_full_unstemmed Land acquisition issues for Jabatan Kerja Raya's road work project
title_sort land acquisition issues for jabatan kerja raya's road work project
granting_institution Universiti Teknologi Malaysia, Faculty of Civil Engineering
granting_department Faculty of Civil Engineering
publishDate 2015
url http://eprints.utm.my/id/eprint/53521/25/NoorFazuraAbuMFKA2015.pdf
_version_ 1747817572208738304