Termination procedures of projects by the public works department (PWD)
Termination of contract is one of the most significant problems in construction industry with major concern is given to public sector projects, as it has a direct relationship with the public and the nation’s socio-economic growth. Projects may suffer cost and time overrun and the owner may suffer s...
محفوظ في:
المؤلف الرئيسي: | Sanusi, Intan Safina |
---|---|
التنسيق: | أطروحة |
اللغة: | English |
منشور في: |
2015
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://eprints.utm.my/id/eprint/53917/25/IntanSafinaSanusiMFAB2015.pdf |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
مواد مشابهة
-
Management of variation order in Public Work Department Malaysia construction project
بواسطة: Amir Mohamed, Sharil Amran
منشور في: (2013) -
An approach to manage termination due to national interest in clause 52.0 OF public work department form 203A (REV.1/2010).
بواسطة: Mansor, Lydiana
منشور في: (2022) -
Termination of contract : abandonment of work
بواسطة: Al Hafiz Mohd. Jamil, Mohd. Nur Iman
منشور في: (2012) -
Mutual termination of contract in construction projects
بواسطة: Jambol, Awang Muhamad
منشور في: (2011) -
The accuracy of preliminary cost estimates in Public Works Department (PWD) of Peninsular Malaysia /
بواسطة: Mohd Azrai Azman
منشور في: (2012)