Termination procedures of projects by the public works department (PWD)
Termination of contract is one of the most significant problems in construction industry with major concern is given to public sector projects, as it has a direct relationship with the public and the nation’s socio-economic growth. Projects may suffer cost and time overrun and the owner may suffer s...
Saved in:
主要作者: | Sanusi, Intan Safina |
---|---|
格式: | Thesis |
语言: | English |
出版: |
2015
|
主题: | |
在线阅读: | http://eprints.utm.my/id/eprint/53917/25/IntanSafinaSanusiMFAB2015.pdf |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|
相似书籍
-
Management of variation order in Public Work Department Malaysia construction project
由: Amir Mohamed, Sharil Amran
出版: (2013) -
An approach to manage termination due to national interest in clause 52.0 OF public work department form 203A (REV.1/2010).
由: Mansor, Lydiana
出版: (2022) -
Termination of contract : abandonment of work
由: Al Hafiz Mohd. Jamil, Mohd. Nur Iman
出版: (2012) -
Mutual termination of contract in construction projects
由: Jambol, Awang Muhamad
出版: (2011) -
The accuracy of preliminary cost estimates in Public Works Department (PWD) of Peninsular Malaysia /
由: Mohd Azrai Azman
出版: (2012)