Wellbore pressure prediction after pipe connection operation in underbalanced drilling
In underbalanced drilling (UBD), bottom hole pressure (BHP) must be maintained in the defined limit. Maintaining underbalanced drilling conditions after pipe connection operation is required for the success of underbalanced drilling operations. Modeling and simulation of gas-liquid two phase flow in...
Saved in:
Main Author: | Kootiani, Reza Cheraghi |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2015
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/54684/1/RezaCheraghiKootianiPFChE2015.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Optimization of underbalanced hydraulics for an aerated mud system
by: Al-Tamimi, Zayed Mohammed Salem
Published: (2014) -
Managed pressure drilling in Malaysia
by: Ishak, Nur Syazana
Published: (2016) -
The use of α-amylase and pullulanase enzymes in wellbore cleaning
by: Mahictin, Masseera
Published: (2012) -
Formulation of a lightweight drilling fluid using biodegradable natural polymers for underbalanced drilling /
by: Lim, Symm Nee
Published: (2015) -
Effect of nanoparticles in cuttings transport perrformance of water based muds at eccentric drill pipe
by: Abuhoureyah, Rafeq Ali Hussein
Published: (2023)