Problems associated with acceleration works and its solutions

Construction industry and delays are no longer a separable issue. In common practice, upon encountering delay the Contractor is either granted an Extension of Time (EOT) in the event of excusable delay or being charged for Liquidated Damages (LAD) in the event of non-excusable delay. Apart from thes...

Full description

Saved in:
Bibliographic Details
Main Author: Mohamad Nazir, Noor Jannah
Format: Thesis
Language:English
Published: 2016
Subjects:
Online Access:http://eprints.utm.my/id/eprint/60961/1/NoorJannahMohamadMFAB2016.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-utm-ep.60961
record_format uketd_dc
spelling my-utm-ep.609612017-10-08T07:34:49Z Problems associated with acceleration works and its solutions 2016-07 Mohamad Nazir, Noor Jannah TH Building construction Construction industry and delays are no longer a separable issue. In common practice, upon encountering delay the Contractor is either granted an Extension of Time (EOT) in the event of excusable delay or being charged for Liquidated Damages (LAD) in the event of non-excusable delay. Apart from these two situations, there is another approach which is rarely being considered in the event of delay which is to accelerate the works. However, like any other new things or development, acceleration is prone to problems. This is due to lack of understanding by the parties regarding acceleration works. That is why the aim of this study is to identify those problems associated with the implementation of acceleration works and solutions to address the problems. These problems were identified by analyzing the Fourth Lane Highway Widening project for PLUS as a case study in order to obtain the problems from a real project rather than theory based. This research was conducted by collecting primary data from a series of interviews as well as collection from secondary data from journal articles, construction law report, etc. All of the data were analyzed using qualitative method. From the interviews, there were twelve problems found regarding the implementation of acceleration works and nine solutions were suggested by the respondents in order to avoid the problems in future. In conclusion, based on the analyzed project, the implementation of acceleration works was not as straight forward as what was found in the literature review however, despite all of the problems encountered, completing the works/achieving the acceleration target is not impossible but great care and thorough considerations must be given especially in monetary issues before commencing acceleration works. 2016-07 Thesis http://eprints.utm.my/id/eprint/60961/ http://eprints.utm.my/id/eprint/60961/1/NoorJannahMohamadMFAB2016.pdf application/pdf en public http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:94008 masters Universiti Teknologi Malaysia, Faculty of Built Environment Faculty of Built Environment
institution Universiti Teknologi Malaysia
collection UTM Institutional Repository
language English
topic TH Building construction
spellingShingle TH Building construction
Mohamad Nazir, Noor Jannah
Problems associated with acceleration works and its solutions
description Construction industry and delays are no longer a separable issue. In common practice, upon encountering delay the Contractor is either granted an Extension of Time (EOT) in the event of excusable delay or being charged for Liquidated Damages (LAD) in the event of non-excusable delay. Apart from these two situations, there is another approach which is rarely being considered in the event of delay which is to accelerate the works. However, like any other new things or development, acceleration is prone to problems. This is due to lack of understanding by the parties regarding acceleration works. That is why the aim of this study is to identify those problems associated with the implementation of acceleration works and solutions to address the problems. These problems were identified by analyzing the Fourth Lane Highway Widening project for PLUS as a case study in order to obtain the problems from a real project rather than theory based. This research was conducted by collecting primary data from a series of interviews as well as collection from secondary data from journal articles, construction law report, etc. All of the data were analyzed using qualitative method. From the interviews, there were twelve problems found regarding the implementation of acceleration works and nine solutions were suggested by the respondents in order to avoid the problems in future. In conclusion, based on the analyzed project, the implementation of acceleration works was not as straight forward as what was found in the literature review however, despite all of the problems encountered, completing the works/achieving the acceleration target is not impossible but great care and thorough considerations must be given especially in monetary issues before commencing acceleration works.
format Thesis
qualification_level Master's degree
author Mohamad Nazir, Noor Jannah
author_facet Mohamad Nazir, Noor Jannah
author_sort Mohamad Nazir, Noor Jannah
title Problems associated with acceleration works and its solutions
title_short Problems associated with acceleration works and its solutions
title_full Problems associated with acceleration works and its solutions
title_fullStr Problems associated with acceleration works and its solutions
title_full_unstemmed Problems associated with acceleration works and its solutions
title_sort problems associated with acceleration works and its solutions
granting_institution Universiti Teknologi Malaysia, Faculty of Built Environment
granting_department Faculty of Built Environment
publishDate 2016
url http://eprints.utm.my/id/eprint/60961/1/NoorJannahMohamadMFAB2016.pdf
_version_ 1747817772675497984