The framework for minimizing construction time and cost overruns in Padang and Pekanbaru, Indonesia
It has been said that Indonesian constructions often suffer serious cost and time overrun. Kaming et.al., (1997a) and Trigunarsyah (2004) have studied the causes of these problems. However, their studies focused only on the high rise buildings in Jakarta and Yogyakarta. Since Indonesia is a large co...
Saved in:
Main Author: | Harisaweni, Harisaweni |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2007
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/6102/1/HarisaweniMFAB2007.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Comparison for components of cost overrun in construction
by: Liu, Linbo
Published: (2014) -
A framework for cost assessment of qms for building contractors based on biological immune system
by: Keyvanfar, Ali
Published: (2009) -
Risk assessment of time and cost overrun factors throughout construction project lifecycle
by: Ismail, Ismaaini
Published: (2014) -
A framework for quality maintenance system in construction industry
by: Tiong, Kung Leong
Published: (2014) -
A contingency-based framework of strategic management accounting, sophisticated budgeting and costing techniques in Malaysian small and medium enterprises
by: Kalkhouran, Abolfazl Amanollah Nejad
Published: (2015)