Pemilihan sistem perparitan sementara untuk diaplikasi di tapak bina
A researched have been conducted to identify method of temporary drainage system that existed at construction site, to identify factors that influenced the selection of temporary drainage to be applied at construction site thus used to develop structured framework system towards the selection of app...
Saved in:
Main Author: | Mahazir, Mashanim |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2006
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/6110/1/MashanimMahazirMFKA2006.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Perlaksanaan MS 2593:2015 (kod amalan kemudahan dan kediaman sementara pekerja tapak bina) di kalangan kontraktor gred 6 dan gred 7
by: Khamis, Norasyikin
Published: (2018) -
Pembaziran bahan di tapak bina
by: Abdullah @ Muthusamy, Khairunisa
Published: (2003) -
Ciri-ciri pengukuhan tanah liat dengan perparitan tegak
by: Syarif, Basri
Published: (2000) -
Sistem perolehan reka dan bina bagi projek Jabatan Kerja Raya
by: Abd. Rahim , Nurzalisa
Published: (2010) -
Kajian ketetapan untuk pemetaan topografi dan pemilihan laluan menggunakan data stereo satelit spot
by: Chek Jusoh, Chek Zainuddin
Published: (1997)