Finite element analysis on the defected reinforced concrete column
In construction industry, misinterpretation of detail drawings is likely to occur in a tight-scheduled project, leading to the non-conformance with the detail drawings. This study is conducted on a damaged column of a real construction project, where the as-built dimension of its stump does not comp...
Saved in:
Main Author: | Chong, Kean Yee |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2007
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/6382/1/ChongKeanYeeMFKA2007.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Frame analysis of reinforced concrete shear walls with openings
by: Wahid, Norlizan
Published: (2007) -
Contractor's liability relating to defective works that are discovered after the defects liability period
by: Leong, Mei Wan
Published: (2010) -
Limitation period in latent defects
by: Lin, Mazuan
Published: (2016) -
Contractor's liabilities towards employer's defective building work claims during defect liability period
by: Lim, Tze Shwan
Published: (2011) -
Behavioural characteristics of precast beam to column connections
by: Ismail, Che Mimi Suriyani
Published: (2014)