Finite element analysis on the defected reinforced concrete column
In construction industry, misinterpretation of detail drawings is likely to occur in a tight-scheduled project, leading to the non-conformance with the detail drawings. This study is conducted on a damaged column of a real construction project, where the as-built dimension of its stump does not comp...
Saved in:
主要作者: | Chong, Kean Yee |
---|---|
格式: | Thesis |
语言: | English |
出版: |
2007
|
主题: | |
在线阅读: | http://eprints.utm.my/id/eprint/6382/1/ChongKeanYeeMFKA2007.pdf |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|
相似书籍
-
Frame analysis of reinforced concrete shear walls with openings
由: Wahid, Norlizan
出版: (2007) -
Contractor's liability relating to defective works that are discovered after the defects liability period
由: Leong, Mei Wan
出版: (2010) -
Limitation period in latent defects
由: Lin, Mazuan
出版: (2016) -
Contractor's liabilities towards employer's defective building work claims during defect liability period
由: Lim, Tze Shwan
出版: (2011) -
Behavioural characteristics of precast beam to column connections
由: Ismail, Che Mimi Suriyani
出版: (2014)