Finite element analysis on the defected reinforced concrete column
In construction industry, misinterpretation of detail drawings is likely to occur in a tight-scheduled project, leading to the non-conformance with the detail drawings. This study is conducted on a damaged column of a real construction project, where the as-built dimension of its stump does not comp...
Saved in:
主要作者: | |
---|---|
格式: | Thesis |
語言: | English |
出版: |
2007
|
主題: | |
在線閱讀: | http://eprints.utm.my/id/eprint/6382/1/ChongKeanYeeMFKA2007.pdf |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|