Finite element analysis on the defected reinforced concrete column

In construction industry, misinterpretation of detail drawings is likely to occur in a tight-scheduled project, leading to the non-conformance with the detail drawings. This study is conducted on a damaged column of a real construction project, where the as-built dimension of its stump does not comp...

全面介紹

Saved in:
書目詳細資料
主要作者: Chong, Kean Yee
格式: Thesis
語言:English
出版: 2007
主題:
在線閱讀:http://eprints.utm.my/id/eprint/6382/1/ChongKeanYeeMFKA2007.pdf
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!