Development of transmission use of system charges scheme for Malaysia transmission network

Presently, the trend of electricity industry is towards restructuring of electricity supply industry, as a means to increase operation efficiency and lower energy costs. Restructuring environment is referring to unbundling of electricity utilities into its basic component such as generation, transmi...

Full description

Saved in:
Bibliographic Details
Main Author: Samsudin, Noor Azam
Format: Thesis
Language:English
Published: 2007
Subjects:
Online Access:http://eprints.utm.my/id/eprint/6409/1/NoorAzamSamsudinMFKE2007.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-utm-ep.6409
record_format uketd_dc
spelling my-utm-ep.64092018-08-29T07:51:02Z Development of transmission use of system charges scheme for Malaysia transmission network 2007-04 Samsudin, Noor Azam TK Electrical engineering. Electronics Nuclear engineering HD61 Risk Management Presently, the trend of electricity industry is towards restructuring of electricity supply industry, as a means to increase operation efficiency and lower energy costs. Restructuring environment is referring to unbundling of electricity utilities into its basic component such as generation, transmission and distribution. One of the outstanding issues in unbundling of electricity supply industry is transmission service pricing. This project is focus on the development transmission use of system charges scheme for Malaysia transmission network in restructuring environment. This project required to identify the costs of transmission services provided by the transmission utility and evaluating the transmission assets. The several alternatives of the allocation methods that can be used to evaluate the usage of transmission services have been studied. From this study, a suitable usage allocation method is identified. This project also involved study the transmission pricing methodologies. As the result, the transmission access pricing for Malaysia transmission will classify. The transmission access pricing must be non discrimination, transparent, economically, efficiency and allow full recovery of costs. Finally, the transmission service charge percentage is allocated between customers and generators. The developed scheme is tested on the bus systems and the TNB system to evaluate its effectiveness providing a fair transmission charges to the users. 2007-04 Thesis http://eprints.utm.my/id/eprint/6409/ http://eprints.utm.my/id/eprint/6409/1/NoorAzamSamsudinMFKE2007.pdf application/pdf en public http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:62273 masters Universiti Teknologi Malaysia, Faculty of Electrical Engineering Faculty of Electrical Engineering
institution Universiti Teknologi Malaysia
collection UTM Institutional Repository
language English
topic TK Electrical engineering
Electronics Nuclear engineering
HD61 Risk Management
spellingShingle TK Electrical engineering
Electronics Nuclear engineering
HD61 Risk Management
Samsudin, Noor Azam
Development of transmission use of system charges scheme for Malaysia transmission network
description Presently, the trend of electricity industry is towards restructuring of electricity supply industry, as a means to increase operation efficiency and lower energy costs. Restructuring environment is referring to unbundling of electricity utilities into its basic component such as generation, transmission and distribution. One of the outstanding issues in unbundling of electricity supply industry is transmission service pricing. This project is focus on the development transmission use of system charges scheme for Malaysia transmission network in restructuring environment. This project required to identify the costs of transmission services provided by the transmission utility and evaluating the transmission assets. The several alternatives of the allocation methods that can be used to evaluate the usage of transmission services have been studied. From this study, a suitable usage allocation method is identified. This project also involved study the transmission pricing methodologies. As the result, the transmission access pricing for Malaysia transmission will classify. The transmission access pricing must be non discrimination, transparent, economically, efficiency and allow full recovery of costs. Finally, the transmission service charge percentage is allocated between customers and generators. The developed scheme is tested on the bus systems and the TNB system to evaluate its effectiveness providing a fair transmission charges to the users.
format Thesis
qualification_level Master's degree
author Samsudin, Noor Azam
author_facet Samsudin, Noor Azam
author_sort Samsudin, Noor Azam
title Development of transmission use of system charges scheme for Malaysia transmission network
title_short Development of transmission use of system charges scheme for Malaysia transmission network
title_full Development of transmission use of system charges scheme for Malaysia transmission network
title_fullStr Development of transmission use of system charges scheme for Malaysia transmission network
title_full_unstemmed Development of transmission use of system charges scheme for Malaysia transmission network
title_sort development of transmission use of system charges scheme for malaysia transmission network
granting_institution Universiti Teknologi Malaysia, Faculty of Electrical Engineering
granting_department Faculty of Electrical Engineering
publishDate 2007
url http://eprints.utm.my/id/eprint/6409/1/NoorAzamSamsudinMFKE2007.pdf
_version_ 1747814653206986752