Employer's rights and contractor's liabilities in relation to construction defects after final certificate
Most of the standard forms of contract contain provisions dealing with defective works. Defective works could be in the forms of design fault, defective building materials or bad workmanships. Any defects, shrinkages or other faults arising during construction and defects liability period due to def...
Saved in:
Main Author: | Tan, Pei Ling |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2007
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/6662/1/TanPeiLingMFAB2007.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Contractor's liability to third party for defective works
by: Mohmad Zainordi, Zainab
Published: (2006) -
Contractor's liability relating to defective works that are discovered after the defects liability period
by: Leong, Mei Wan
Published: (2010) -
Contractor's liabilities towards employer's defective building work claims during defect liability period
by: Lim, Tze Shwan
Published: (2011) -
Determination of own employment by contractor : implication on performance bond
by: Awang Bujang, Awang Ariffin
Published: (2009) -
The liability of contract administrator for wrongful certification to employer and contractor
by: Sabtu, Zamzillah
Published: (2008)