Comparison of Five Alternative Manufacturing Strategies For increasing Job Shop Capacity and Their Impact on Manufacturing Performance

Managing job shop manufacturing is quite different compared to other manufacturing systems due to its dynamic changes in process routings, cycle times and fluctuations in demand. Managers in job shops face problems in attaining optimum performance of the job shops. These can lead to failure to meet...

Full description

Saved in:
Bibliographic Details
Main Author: Salehun, Md Amirul Khair
Format: Thesis
Published: 2004
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-utm-ep.6957
record_format uketd_dc
spelling my-utm-ep.69572011-01-21T05:51:13Z Comparison of Five Alternative Manufacturing Strategies For increasing Job Shop Capacity and Their Impact on Manufacturing Performance 2004 Salehun, Md Amirul Khair TJ Mechanical engineering and machinery Managing job shop manufacturing is quite different compared to other manufacturing systems due to its dynamic changes in process routings, cycle times and fluctuations in demand. Managers in job shops face problems in attaining optimum performance of the job shops. These can lead to failure to meet due dates, low machine level utilization and high level of work-in-progress (WIP). These problems can be exacerbated when management has to consider reacting to increased demand, which requires adding additional capacity. Increasing capacity may involve multiple alternatives for which little practical guidelines currently exist. This research investigates, by using simulation approach, the implication of adopting five possible alternatives of increasing job shop capacity and flexibility in terms of their system performance subjected to varying levels of incoming orders and order priorities. The measures of system performance are i.) minimization of tardy jobs, ii.) level of WIP and iii.) machine utilization. A case study of a mold and die machine shop was used as the basis of the research. It was found that the most optimum alternative in increasing capacity is by selectively introducing machines to duplicate existing ones as opposed to replacing existing ones by a single flexible machine capable of performing operations previously done by several machines. The result of the study also serves as a practical guideline to the managers wishing to add capacity in similar circumstances. This however must be taken within the limitations and constraints of the case study. 2004 Thesis http://eprints.utm.my/id/eprint/6957/ http://sps.utm.my masters Universiti Teknologi Malaysia, Faculty of Mechanical Engineering Mechanical Engineering
institution Universiti Teknologi Malaysia
collection UTM Institutional Repository
topic TJ Mechanical engineering and machinery
spellingShingle TJ Mechanical engineering and machinery
Salehun, Md Amirul Khair
Comparison of Five Alternative Manufacturing Strategies For increasing Job Shop Capacity and Their Impact on Manufacturing Performance
description Managing job shop manufacturing is quite different compared to other manufacturing systems due to its dynamic changes in process routings, cycle times and fluctuations in demand. Managers in job shops face problems in attaining optimum performance of the job shops. These can lead to failure to meet due dates, low machine level utilization and high level of work-in-progress (WIP). These problems can be exacerbated when management has to consider reacting to increased demand, which requires adding additional capacity. Increasing capacity may involve multiple alternatives for which little practical guidelines currently exist. This research investigates, by using simulation approach, the implication of adopting five possible alternatives of increasing job shop capacity and flexibility in terms of their system performance subjected to varying levels of incoming orders and order priorities. The measures of system performance are i.) minimization of tardy jobs, ii.) level of WIP and iii.) machine utilization. A case study of a mold and die machine shop was used as the basis of the research. It was found that the most optimum alternative in increasing capacity is by selectively introducing machines to duplicate existing ones as opposed to replacing existing ones by a single flexible machine capable of performing operations previously done by several machines. The result of the study also serves as a practical guideline to the managers wishing to add capacity in similar circumstances. This however must be taken within the limitations and constraints of the case study.
format Thesis
qualification_level Master's degree
author Salehun, Md Amirul Khair
author_facet Salehun, Md Amirul Khair
author_sort Salehun, Md Amirul Khair
title Comparison of Five Alternative Manufacturing Strategies For increasing Job Shop Capacity and Their Impact on Manufacturing Performance
title_short Comparison of Five Alternative Manufacturing Strategies For increasing Job Shop Capacity and Their Impact on Manufacturing Performance
title_full Comparison of Five Alternative Manufacturing Strategies For increasing Job Shop Capacity and Their Impact on Manufacturing Performance
title_fullStr Comparison of Five Alternative Manufacturing Strategies For increasing Job Shop Capacity and Their Impact on Manufacturing Performance
title_full_unstemmed Comparison of Five Alternative Manufacturing Strategies For increasing Job Shop Capacity and Their Impact on Manufacturing Performance
title_sort comparison of five alternative manufacturing strategies for increasing job shop capacity and their impact on manufacturing performance
granting_institution Universiti Teknologi Malaysia, Faculty of Mechanical Engineering
granting_department Mechanical Engineering
publishDate 2004
_version_ 1747814705012932608