Contractor’s liability under unforeseen ground conditions
Ground condition is one of the factors that determine the project successfulness. The unforeseen ground condition defined as an un-anticipated physical condition other than weather, climate, or another act of God discovered on site during the works commencement. The worse ground condition makes the...
Saved in:
Main Author: | Permana, Assad Idea |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2015
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/77627/1/AssadIdeaPermanaMFAB20151.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Contractor's liability under clause 18.0 of PAM 2006
by: Abdul Ghani, Hafizan
Published: (2008) -
Contractor's liability relating to defective works that are discovered after the defects liability period
by: Leong, Mei Wan
Published: (2010) -
Contractor's liability as an occupier of site during construction
by: Sahibudin, Shafika
Published: (2009) -
Contractor's liabilities towards employer's defective building work claims during defect liability period
by: Lim, Tze Shwan
Published: (2011) -
Contractor's liability to third party for defective works
by: Mohmad Zainordi, Zainab
Published: (2006)