Contractor’s liability under unforeseen ground conditions
Ground condition is one of the factors that determine the project successfulness. The unforeseen ground condition defined as an un-anticipated physical condition other than weather, climate, or another act of God discovered on site during the works commencement. The worse ground condition makes the...
Saved in:
主要作者: | Permana, Assad Idea |
---|---|
格式: | Thesis |
語言: | English |
出版: |
2015
|
主題: | |
在線閱讀: | http://eprints.utm.my/id/eprint/77627/1/AssadIdeaPermanaMFAB20151.pdf |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
相似書籍
-
Contractor's liability under clause 18.0 of PAM 2006
由: Abdul Ghani, Hafizan
出版: (2008) -
Contractor's liability relating to defective works that are discovered after the defects liability period
由: Leong, Mei Wan
出版: (2010) -
Contractor's liability as an occupier of site during construction
由: Sahibudin, Shafika
出版: (2009) -
Contractor's liabilities towards employer's defective building work claims during defect liability period
由: Lim, Tze Shwan
出版: (2011) -
Contractor's liability to third party for defective works
由: Mohmad Zainordi, Zainab
出版: (2006)