Limitation period in latent defects
Under traditional contract, a contractor is responsible for the quality of material and workmanship either being expressed in the contract document or by implication. Contractors often believe that the latent defects is no longer their responsibility after the job is handed over to the employer or s...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2016
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/77710/1/MazuanLinMFAB2016.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|