The superintending officer’s duties under JKR Sarawak form of contract PWD 75 (Ver. 2006)
The JKR Sarawak Form of Contract PWD 75 (Ver. 2006) was officially launched on 2007 to be used for administering the construction contract. Under PWD 75 (Ver. 2006), the Superintending Officer (S.O) will be appointed and is responsible to act reasonably in supervision of the project. The standard of...
Saved in:
主要作者: | Engkamat, Frauline |
---|---|
格式: | Thesis |
语言: | English |
出版: |
2009
|
主题: | |
在线阅读: | http://eprints.utm.my/id/eprint/78144/1/FraulineEngkamatMFAB20091.pdf |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|
相似书籍
-
The superintending officer's duties under JKR Sarawak form of contract PWD 75 (Ver.2006)
由: Engkamat, Frauline
出版: (2009) -
Evaluation on PWD 75, standard form of general conditions of contract in Sarawak
由: Sia, Pik Soon
出版: (2008) -
Level of understanding the contract requirements of PWD 203A (Rev.2007) standard form of contract among the construction professional
由: Abu Bakar, Norazreen
出版: (2011) -
Risks in the PAM 2006 standard form of contracts
由: Arjinan, Sangeetha
出版: (2014) -
Contractor's standard of duty for design in traditional contract
由: Abdullah, Mohammad Firdaus
出版: (2012)